Where every machine sits, how material reaches it, and what the floor underneath has to carry.
"I have the machines, I need to know how to lay them out" is one of the more common ways this conversation starts — sometimes for a new plant, often for a shop floor that has grown by accretion until nobody can move a pallet without going the long way round.
Layout is where a large amount of avoidable operating cost is either designed out or locked in for a decade. A line laid out to minimise travel, double-handling and cross-traffic does not need re-laying out in two years, and the floor under it does not crack because it was specified for the loads it actually carries.
Machines are positioned against the process sequence and the material route, not against the shape of the building. Incoming stock, work in progress and finished goods each get a defined path, and those paths are kept from crossing — on the Solapur machining campus, raw material entered the machine shop from the warehouse side, moved through lines L#01 to L#10, and finished parts left by an entirely separate route, because contamination on precision components is a quality failure.
Operator positions, inspection points, tool storage and scrap removal are placed in the same exercise. They are what determine whether the layout works on a Tuesday afternoon, and they are what a purely equipment-driven layout leaves out.
Maintenance access, door swings, guard opening, chip conveyor withdrawal, pallet turning circles and forklift aisles are set from the real equipment drawings rather than a nominal gap. The common failure is a layout that satisfies the machine footprint and leaves no room to pull a spindle or turn a stacker.
Statutory clearances — gangway widths, fire escape routes, electrical panel working space — are checked at the same time, because retro-fitting them means moving machines that are already grouted down.
Layout and floor specification are the same decision. We work from the equipment schedule — machine weights, footprints, dynamic loads and vibration sensitivity — to a uniformly distributed load and a puncture load per footprint. On the Solapur facility that produced 5 MT UDL plus 8 MT puncture load with a laser-screeded FM II finish, appropriate to precision equipment rather than general industrial traffic.
Provision for what you will add later belongs in the same drawing. A jack beam along each line, service drops at planned positions and spare capacity in the compressed air and power runs cost very little now and are disruptive to add into a running shop floor.
Usually in phases, yes — but it starts with an honest survey, because on an established plant the as-built layout and the drawings have almost always diverged. We then sequence the moves so that each step leaves a workable floor, which normally means the relayout takes longer than a greenfield one and costs far less than the disruption of doing it all at once.
It comes from your machines, not from a standard. Machine weights, footprints, dynamic loads and vibration sensitivity give a uniformly distributed load and a puncture load per footprint, and the slab, reinforcement and finish flatness class are specified against those figures. Over-designing a floor is expensive; under-designing one is expensive later, which is worse.
Yes — every project is modelled before construction begins, and clash detection between structure, services and process equipment happens in the model rather than on site. Catching a conflict between a crane runway and a duct run costs an afternoon in the model; catching it on site costs rework and programme. This is where the 10–15% construction cost saving we quote actually comes from.
It is the first question every client asks, and an honest answer needs two things from you: the process the building has to house, and the plot. A general-purpose shed and a heavy manufacturing bay of the same floor area differ by a wide margin, because the heavy bay needs crane-rated structure, process zoning and power infrastructure the shed does not. Consultancy fees are normally a percentage of construction cost, scaled to the scope you actually need — design only, design plus coordination, or full project management. Send us the plot details and what you intend to manufacture and you will get a specific fee proposal rather than a range.
Tell us the plot and what you intend to manufacture. Industrial projects from ₹5 Crore upward.